Clip-Loc Intermediate is designed for use on inground liner pools. The Clip-loc method uses the liner track as a secure mounting device. When this form is properly attached, concrete will not contaminate the liner receiver.
[{"title":{"part #":"Description:"},"values":[{"8CF1002":"Clip Loc Intermediate With Liner Track"}]},{"title":{"Quantity:":""},"values":[{"14":"Clip-Loc Intermediate Forms (8′ lengths)"},{"14":"Liner Track (8′ lengths)"},{"100":"Self-Tapping Screws"},{"1":"Roll Bending Tape"}]},{"title":{"part #":"Description:"},"values":[{"8CF1002NT":"Clip Loc Intermediate Without Liner Track"}]},{"title":{"Quantity:":""},"values":[{"14":"Clip-Loc Intermediate Forms (8′ lengths)"},{"1":"Roll Bending Tape"}]},{"title":{"part #":"Description:"},"values":[{"8CF1002FT":"Clip Loc Intermediate With Flex Track"}]},{"title":{"Quantity:":""},"values":[{"14":"Clip-Loc Intermediate Forms (8′ lengths)"},{"14":"Flex Liner Track (8′ lengths)"},{"100":"Self-Tapping Screws"},{"1":"Roll Bending Tape"}]}]
Product Detail
Installation
Associated Products & Accessories
Documents
Video
Step 1. Wipe the top and face of the pool wall with a clean cloth to remove any dirt or moisture. Place the track on the top of the pool wall as shown in the illustration. Line the bottom lip of the liner track flush with the face of the pool wall. Use the self-tapping screws provided to fasten the track down. It is important to have the track butted tightly together
Note : During cold weather it may be necessary to heat the pool wall prior to sticking the form.
Step 2. Peel the paper on the double faced tape (one foot at a time). Align the rib of the form with the opening of the liner track and press on the back of the form until you hear the clip snap into place.
Step 3. While pouring tap the form to release air bubbles. This will help prevent honeycombing.
Step 4. When concrete is strong enough to support its own weight, forms can be removed. Pull form away to expose the face for finishing.
Note: Removing the forms one piece at a time will help keep the moisture in the concrete to allow adequate time to finish.